Concrete Construction: Vol. 63, № 6 (September/October 2018)


 Volume: 63 |  Issue: 6 |  Download

ON THE COVER: T.Y. Lin International, International Bridge Technologies, and SNC-Lavalin have 21 months to replace the Champlain Bridge over the St. Lawrence River and Seaway. Photo: Infrastructure Canada.